ANALYSIS OF OVER CURRENT RELAY AND GROUND FAULT RELAY PROTECTION SYSTEM IN SUB-STATION SP-2 TANAH MIRING USING RELAY COORDINATION WITH ETAP BASED

Soetjipto Soewono(1), Enni Noprianti(2),


(1) Institute Technology PLN
(2) Institute Technology PLN
Corresponding Author

Abstract


Short-circuit often occur in electricity sub-station SP-2 Tanah Miring, Merauke -Papua which caused by malfuction of Over Current Relay (OCR) and Ground Fault Relay (GFR). In enhancing the performance, it takes analysis of relay coordination using ETAP. At maximum load of feeder SP-9 (917 A) an OCR setting is 4.5 A with TMS 0.46 seconds, GFR setting is 4.58 A with TMS 0.17 seconds. At minimum load (324 A) OCR setting is 1.62 A with TMS 0.29 seconds as for the GFR setting is 1.62 A with TMS 0.22 seconds. At the maximum load of feeder Kebun Cokelat (995 A) an OCR setting is 4.97 A with TMS 0.46 seconds as for GFR set is 4.97 A with TMS 0.17 seconds. At minimum load 100 A, OCR setting is 0.5 A with TMS 0.43 seconds while GFR setting is 0.5 A with TMS 0.35 seconds. Furthermore, if the minimum load reach 98 A then the coordination time of GFR and OCR is 0,5 seconds. This analysis found that relay prohibited to operate above 1100 A (maximum) and below 98 (minimum) due to if it working out of the load range then the coordination time would not meet the manual standard.


Keywords


IFAULT, OCR, GFR, Load, TMS

References


M. Pujiantara, D. C. Riawan, A. Indrasaputra, T. P. Sari, and V. Raki Mahindara, “The automation of time dial setting calculation and inverse type curve selection for over current relay based on numerical computation in real industrial electrical system,” 4th IEEE Conf. Power Eng. Renew. Energy, ICPERE 2018 - Proc., pp. 1–6, 2018.

T. S. Aghdam, H. K. Karegar, and A. Abbasi, “Discussion on ‘Optimal Protection Coordination for Meshed Distribution Systems with DG Using Dual Setting Relays,’” IEEE Trans. Smart Grid, vol. 7, no. 3, p. 1756, 2016.

A. M. Ibrahim, W. El-khattam, M. Elmesallamy, and H. A. Talaat, “Adaptive protection coordination scheme for distribution network with distributed generation using ABC,” J. Electr. Syst. Inf. Technol., vol. 3, no. 2, pp. 320–332, 2016.

A. N. Standard, IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems Sponsor Industrial and Commercial Power Systems Department of the IEEE Industry Applications Society IEEE-SA Standards Board, 2001st ed., vol. 2001. IEE-SA, 2001.

L. Sugesti, A. N. Afandi, and H. Putranto, “Setting Analysis of over Current Relay and Ground Fault Relay on Transformer Protection System of High Voltage Substation System,” 2018 Electr. Power, Electron. Commun. Control. Informatics Semin. EECCIS 2018, pp. 27–31, 2018.

T. P. Sari, A. Priyadi, M. Pujiantara, and M. H. Purnomo, “Enhancing the coordination of reverse power, overcurrent, under-frequency, and under-voltage relays using transient stability analysis in real plant applications,” Ain Shams Eng. J., vol. 11, no. 1, pp. 1–9, 2020.

K. J. Aryamantara, I. A. . Giriantari, and I. . Sukerayasa, “Analisis Hubung Singkat Pada Jaringan Tegangan Menengah 20 kV Penyulang Kedonganan,” Maj. Ilm. Teknol. Elektro, vol. 17, no. 2, p. 213, 2018.

A. E. P. Ismail, T. I. Yusuf, and E. H. Harun, “Studi Koordinasi Relai Arus Lebih dan Gangguan Tanah pada Penyulang Gardu Induk 20 kV Marisa,” J. Tek., vol. 16, no. 2, pp. 109–125, 2018.

Y. Yusmartato, “Analisa Relai Arus Lebih Dan Relai Gangguan Tanah Pada Penyulang LM5 Di Gardu Induk Lamhotma,” J. Electr. Technol., vol. 1, no. 2, pp. 30–36, 2016.

S. H. Lim and S. T. Lim, “Analysis on Coordination of Over-Current Relay Using Voltage Component in a Power Distribution System with a SFCL,” IEEE Trans. Appl. Supercond., vol. 29, no. 5, p. 1, 2019.

M. Kusuma, “Evaluasi Koordinasi Proteksi Relay Arus Lebih dan Gangguan Tanah GIS Kandang Sapi Penyulang Garden 1, Garden 2, Aeon 1, Aeon 2, Ladang , Lapindo, dan Blethok Menggunakan ETAP 12.6.0,” TRANSIENT, vol. 6, no. 4, pp. 1–7, 2017.

S. Xie, X. Wang, C. Qu, X. Wang, and J. Guo, “Impacts of different wind speed simulation methods on conditional reliability indices,” Int. Trans. Electr. energy Syst., vol. 20, pp. 1–6, 2015.

X. Y. Wang, X. G. Wang, D. H. Chen, S. Su, and X. N. Lin, “Optimal protection coordination based on dual directional over-current relays for ring network distribution power systems,” Adv. Power Energy Eng. - Proc. 8th Asia-Pacific Power Energy Eng. Conf. APPEEC 2016, pp. 75–81, 2016.

S. Electric, “Sepam TM Series 20 & 40 Relays,” in User Manual Electrical Network Protection, 2017, p. 35,73.

M. Y. Shih and A. Conde, “Implementation of Directional Over-current Relay Coordination Approaches in Electrical Networks,” Electr. Power Components Syst., vol. 43, no. 19, pp. 2131–2145, 2015.


Full Text: PDF

Article Metrics

Abstract View : 714 times
PDF Download : 86 times

DOI: 10.56327/ijiscs.v4i2.903

Refbacks

  • There are currently no refbacks.